Author Archive
Iron Ore (Fe) 63.5% (Rejection Below 62.5%) – Mexico
Price
US$139/MT
Quantity
65,000 MT (Metric Ton)
Maximum 600,000 MT per month
Payment
Letter of Credit (L/C)
– 98% on sight in Seller’s Port
– 2% in Main Port China
Contact us for more details with your Letter of Intent (LOI).
Shipping Terms
C&F (Cost and Freight) Main Port China
Heavy Fuel Mazut M100
(UPDATE – MARCH 2011: Please note, these prices were correct as at the date of posting. For up to date prices, please contact us as prices have increased due to increasing fuel prices caused by conflict in the Middle East.)
Price
US$400
Quantity
500,000 MT (Metric Ton)
Payment
Letter of Credit (L/C)
Shipping Terms
CIF (Cost, Insurance and Freight)
Sugar ICUMSA-45 – High Sea Sales (HSS)
(UPDATE – MARCH 2011: Please note, these prices were correct as at the date of posting. For up to date prices, please contact us as prices have increased due to increasing fuel prices caused by conflict in the Middle East.)
Price
US$600
Quantity
250,000 MT (Metric Ton)
Payment
Letter of Credit (LC)
Shipping Terms
CIF (Cost, Insurance and Freight)
ETA (Estimated Time of Arrival)
Dubai = 10 days
Karachi 13-14 days
Iron Ore – Brazil or Indonesia origin
Price
US$135
Quantity
500,000 MT (Metric Ton)
Payment
Letter of Credit (L/C)
Shipping Terms
CIF (Cost, Insurance and Freight)
Magnetite Iron Ore – 25,000MT shipment
Specification
Fe: 61% Basis (60% min)
Feo: 15% min
Sio2: 7.00%
Al2O3: 1%
P: 0.10%
S: 0.10%
Moisture: 4% max(Free moisture loss at 105 degrees centigrade)
Size: 0 – 30 mm 90% min
+30 mm 10% max
Shipment: Bulk
Price
$138/MT CFR China Port
Quantity
25,000 MT (Metric Tons)
Payment
Letter of Credit (LC)
Stock Location
Indonesia
Shipping Terms
CFR (Cost and Freight)
Bitumen – all grades
We can supply Bitumen in Grades 6/12, 10/20, 20/30,30/40, 40/50, 60/70,80/100,180/200, MC 30 Cut Back Bitumen, MC70 Cut Back Bitumen, Oxidized Bitumen R85/25 and Oxidized Bitumen R90/15.
Validity Date
15 May 2011
Unit Price
Price on enquiry.
Quantity
100,000 MT (Metric Tons)
Payment
Letter of Credit (LC)
Delivery Time
30 days upon confirmation
Shipping Terms
FOB (Free On Board)
Oxidized Bitumen R 115/15
Validity Date
16 December 2010
Unit Price
US$10
Quantity
18 MT (Metric Ton)
Payment
Letter of Credit (LC)
Delivery Time
7 days upon confirmation
Shipping Terms
CIF (Cost, Insurance and Freight)
Iron Ore Pellets 65.5% grade – Brazil
Unit Price
US$10
Quantity
300,000 MT (Metric Tons)
Payment
Letter of Credit (LC)
Delivery Time
7 days upon confirmation
Shipping Terms
CIF (Cost, Insurance and Freight)
Magnetite Iron Ore – 2 ready shipments
We have 2 immediate offer ready shipments of 10,000MT each.
If your Buyer can issue a Purchase Order and promptly draft the contract, the commodity is ready to ship.
61/59 below rejection $123 – Shanghai port – CFR
LC at sight 10,000MT Cargo ready.
% Feo 15min
%Al203 3 max
%si02 7max
% S 0.15max
% P 0.15max
61% 60 below rejection $124 – Shanghai Port – CFR
LC at sight 10,000MT Cargo Ready.
% Feo 15min
%Al203 3max
% sio2 7max
% S 0.1max
%P 0.1max
Magnetite Iron Ore – all grades
Magnetite Iron Ore all Grades
Magnetite Iron Ore Fe: 66%,
Magnetite Iron Ore Fe: 61%,
Magnetite Iron Ore Fe: 45% , 57%
and Iron Pellets
Large Quantities are available now.
Quantity
250,000 MT (Metric Tons)
Payment
Letter of Credit (LC)
Shipping Terms
CIF (Cost, Insurance and Freight)